Project costs are billed based on time projections. Like a construction project, an agreed upon sum will be predetermined based on expected completion. Additional costs may be incurred if significant changes to the scope of the project are incurred. All work will be pre-negotiated with contractual obligations to both the client and Transition Element Limited. The assumed hourly cost is 45$ CAD/Hour.
Some projects may require specific testing or materials that are not available in house. These prices will be presented in the contractual agreement and stipulated before they are purchased or acquired. The costs of those materials or testing will be presented up front and agreed upon before those costs are incurred.